PIGEON MOUNTAIN INTERSECTION UPGRADE
2015
Road safety investigation, scheme and construction plans for a major upgrade at the 'Stop' controlled junction to address adverse crash statistics and to improve operational efficiency. Substantial kerb cut-back was required with multiple retaining walls being required.
Professional services included pavement design, storm-water, landscape architect, utility service adjustments, street lighting, and structural engineering. Constructed in 2015 at a cost of around $150,000.
​