top of page

PIGEON MOUNTAIN INTERSECTION UPGRADE

2015

 

Road safety investigation, scheme and construction plans for a major upgrade at the 'Stop' controlled junction to address adverse crash statistics and to improve operational efficiency. Substantial kerb cut-back was required with multiple retaining walls being required.

 

Professional services included pavement design, storm-water, landscape architect, utility service adjustments, street lighting, and structural engineering. Constructed in 2015 at a cost of around $150,000.

​

© 2025 by TES Limited.

  • LinkedIn Social Icon
bottom of page