© 2019 by TES Limited.

  • LinkedIn Social Icon

TRAFFIC SIGNAL DESIGN

2003 - 2019

TES has prepared CAD base, scheme and construction plans for new traffic signals at priority controlled junctions and at midblock locations.  Also, we have prepared many traffic signal construction plans for upgrading existing signalised intersections. Examples include signalisation of a 4-way priority controlled junction (Royal/Vadam/Westgate), new midblock signals (Rata/Rimu), and substantial signal design and phasing changes at Strategic/Arterial junctions (Fanshawe/Halsey). Construction plan signal specifications were required to comply with TMU/JTOC/Austroads requirements, and project support included cost schedules and construction supervision.

1/8
TES Logo - white text white black circle